PRODUCTION15a

Process improvement

  • Improvement of production and non-production business processes. Solutions of technological problems in the area of railway carriages welding. Optimization of each step of production, proposals for changes of production dispositions. Optimization of welding line start-up, lines balancing. Creating of projects for improvement and optimization of production, coordination of several departments to improve the production process.

PRODUCTION15a

Design and planning of ultrasonic inspection of welds

  • Creating inspections plans for the inspection of welds through non-destructive methods, most commonly by the ultrasonic method. Using the program UltraLOG Database Manager. Testing on the Spot Checker device uses to measure and record of restults of measurement the software UltraLOG server and USLT 2000.